ESTEE LAUDER

TAKE A LOOK AT SOME OF OUR FEATURED PROJECTS
ESTEE LAUDER

SpecialistEngineering

  • SECTOR Beauty
  • MANAGEMENT Engineering
  • REQUIREMENT Specialist
DOWNLOAD PROJECT PDF

project description

AlphaDrive has been working with Estee Lauder for nearly 7 years and this is where our bespoke online asset management cloud was designed.

OBJECTIVESEstee Lauder has for years, had huge problems with both downtime costs and also standardisation of geared units for correct spares.

Understand the true cost of downtime, define a process for identifying what drives were on the plant, standardising that equipment and then creating a standard stock to cover the plant then using the online database.

GOALS

When AlphaDrive first discussed these issues their aim was to never be down any longer than 24 hours down due to mechanical failure.  With the experience AlphaDrive had, we confirmed that it should actually never be any longer than a maximum of 4 hours.  To put this into real-world cost based on the cheapest item they produced would mean a downtime cost of £74,000 per hour totalling a loss of £1,777,7776 for the client.

features of this project
  • Standardising System Architecture
  • Reduction in Downtime
  • Stock Management Optimisation
  • Increased Unit Lifespan
loading